Name of Work Selection, supply, erection, commissioning and maintenance of the Multirake Mechanical Coarse Bar Screen & Face Wall mounted Sluice Gates with accessories and equipments after replacement of existing Screens/Gates in Screen chamber including complete renovation of the existing chamber, temporary by-pass arrangement of drainage/storm water for the Storm Water Drainage pumping station at Noapara, Baranagore under Kolkata Metropolitan Development Authority.
Site NOAPARA NOAPARA, DPS
Type of Project DRAINAGE PUMPING STATION
Work Order Date Memo No.35/SE/MC-1/E&M/KMDA/W-139/13 20.09.2013
Completion Date 20.03.2014
TENDER VALUE 2,20,00,000/-
TENDER AUTHORITY KMDA
Scope of Work
  • Supply, delivery, storage and installation of mechanically operated coarse bar screen complete with conveyer, control panel, cables, earthing connections and all other accessories as per technical spec.
  • Supply, delivery, storage and installation of manually operated sluice gate ( 1500mm x 2000mm) with all accessoriesas per approved spec.
  • Demolition of existing civil construction as per requirement and new civil construction work ( RCC/PCC) as per requirement including supply of all civil materials, MS fabricated items as required installation of coarse bar screens, sluice gates, chain pulley blocks including all accessories as per spec.
  • Dismantling of existing sluice gates, Bar Screens, Chain Pulley Blocks and other MS fabricated structure and transfering all dismantled materials from site to KMDA's godown.
  • Making bypass arrangement of incoming drainage/storm water by using temporary diesel engine operated oump and temporary piping suitable for transfering drainage/storm water 4000 m3 /hr at a Head to suite site requirement during the installation work of Mechanical Coarse Bar Screen/ Sluice Gates etc.
  • Painting of all new/renoveted/repaired civil andmachanical installation .
  • Supply, delivery, storage and installation of 4 MT Chain Pulley Block complete in all respect with suitable MS I ) Sections and all other accessories.
  • Trial run of the installation.